pg. 1 655680 1964-67 CHEVELLE POWER RACK AND PINION KIT INSTALLATION INSTRUCTION MANUAL 8010780-01 & 8010780-02 Full refund will NOT be grant
pg. 2 655680 Kit Contents: # Part Number Description Quantity 1 8010770-01 Rack & Pinion Assembly 1 1 8060700 Pump Kit 1 2 8021580 Hose Kit w/
pg. 3 655680 6. Remove cotter pins & nuts at outer tie rod ends. 7. Remove two bolts & nuts at passenger side of vehicle attaching idler
pg. 4 655680 11. Remove four bolts retaining stabilizer bar mount bushing & let stabilizer hang free from links. Installation: 1. Your rack
pg. 5 655680 Shaft Installation: 1. Cut the steering column 1” from the bottom support bearing (see pic below). 2. Install column joint end onto
pg. 6 655680 7. Slide lower shaft through heim joint & install bracket over the driver side from bolts & mounting bracket. 8. Install u-j
pg. 7 655680 2. Next, route your lines from the remote reservoir to the return side of the pump and then out the pressure side of the pump to the
Comments to this Manuals